$TXT Created by at CLN1G1.AAC.DOMAIN.EXT (KIDS) on Friday, 05/17/19 at 08:54 ============================================================================= Run Date: JUN 28, 2019 Designation: LR*5.2*523 Package : LR - LAB SERVICE Priority: Mandatory Version : 5.2 SEQ #425 Status: Released Compliance Date: JUL 29, 2019 ============================================================================= Associated patches: (v)LR*5.2*516 <<= must be installed BEFORE `LR*5.2*523' (v)LR*5.2*520 <<= must be installed BEFORE `LR*5.2*523' Subject: MOST RECENT REPORT IN CPRS BUTTONS GREYED OUT Category: - Routine Description: ============ This patch will address the following ticket, which was discovered during testing of LR*5.2*520. INC5168203 - Most Recent report in Computerized Patient Record System (CPRS) buttons greyed out Blood Bank Review: ------------------ EFFECT ON BLOOD BANK FUNCTIONAL REQUIREMENTS: Patch LR*5.2*523 does not contain any changes to the VISTA BLOOD BANK Software as defined by ProPath standard titled: BBM Team Review of VistA Patches. EFFECT ON BLOOD BANK FUNCTIONAL REQUIREMENTS: Patch LR*5.2*523 does not alter or modify any software design safeguards or safety critical elements functions. RISK ANALYSIS: Changes made by patch LR*5.2*523 have no adverse effect on Blood Bank software functionality, therefore RISK is none. VALIDATION REQUIREMENTS BY OPTION: Because of the nature of the changes made, no specific validation requirements exist as a result of installation of this patch. Defect Tracking System Ticket(s) & Overview: -------------------------------------------- 1. INC5168203 - Most Recent report in CPRS buttons greyed out Problem: -------- After cancelling a Microbiology (MI) subscripted test, go into CPRS under the Most Recent report and the canceled MI subscripted test is the most recent result. If you click Next, then all the buttons grey out and you can no longer move between the previous and next results. This only happens if the most recent result is a canceled MI subscripted test. This occurs when there are Chem (CH) and MI tests entered for the same time and then both are canceled. This was found when a test site was testing patch LR*5.2*520. Resolution: ----------- Modify routine LR7OGM to adjust NEWOLD variable values to reverse date for valid comparison to variable IDT. Prior to this patch the check if NEWOLD was not equal to IDT would always be true. This patch also adds logic to set piece 9 of ^TMP("LR7OGX",$J,"OUTPUT",1) to either 1 or 2 if no chemical test is displayable when a MI & CH test are at the same date/time - to accomplish this LR7OGMC was modified to quit out when FORMAT=4 that will return SKIP but no other data as when FORMAT is 1,2, or 3. Test Sites: ---------- San Diego VAMC Southeast Louisiana HCS Patch Installation: Pre-Installation Instructions: ------------------------------ This patch may be installed with users on the system. Installation should take less than 1 minutes to complete. Installation Instructions: -------------------------- 1. Choose the PackMan message containing this patch. 2. Choose the INSTALL/CHECK MESSAGE PackMan option. 3. From the Kernel Installation and Distribution System Menu, select The Installation Menu. From this menu, you may elect to use the following options. When prompted for the INSTALL NAME enter the patch LR*5.2*523 a. Compare Transport Global to Current System - This option will allow you to view all changes that will be made when this patch is installed. It compares all components of this patch routines, DDs, templates, etc. b. Verify Checksums in Transport Global - This option will allow you to ensure the integrity of the routines that are in the transport global. 4. From the the Installation Menu, select Backup a Transport Global - This option will create a backup message of any routines exported with this patch. It will not backup any other changes such as DDs or templates. 5. From the Installation Menu, select the Install Package(s) option and choose the patch to install (LR*5.2*523). 6. When prompted 'Want KIDS to INHIBIT LOGONs during the install? NO//', respond NO. 7. When prompted 'Want to DISABLE Scheduled Options, Menu Options, and Protocols? NO//', respond NO. Back-out/Rollback Strategy: --------------------------- In the event of a catastrophic failure, the Facility CIO may make the decision to back-out the patch. It is imperative that you have performed a backup of the routine included in this patch prior to installation. The back-out plan is to restore the routine from the backup created. No data was modified by this patch installation and, therefore, no rollback strategy is required. To verify the back-out completed successfully, ensure the checksum matches the pre-patch checksum from the patch descriptions. Routine Information: ==================== The second line of each of these routines now looks like: ;;5.2;LAB SERVICE;**[Patch List]**;Sep 27, 1994;Build 4 The checksums below are new checksums, and can be checked with CHECK1^XTSUMBLD. Routine Name: LR7OGM Before: B42661615 After: B47777096 **187,220,312,286,395,350,523** Routine Name: LR7OGMC Before: B37375586 After: B38181513 **187,230,312,286,356,372,395, 350,516,523** Routine list of preceding patches: 516 ============================================================================= User Information: Entered By : Date Entered : APR 08, 2019 Completed By: Date Completed: JUN 26, 2019 Released By : Date Released : JUN 28, 2019 ============================================================================= Packman Mail Message: ===================== $END TXT