============================================================================= Run Date: MAR 06, 2017 Designation: RA*5*134 Package : RA - RADIOLOGY/NUCLEAR MEDICINE Priority: Mandatory Version : 5 SEQ #116 Status: Released Compliance Date: APR 06, 2017 ============================================================================= Associated patches: (v)RA*5*127 <<= must be installed BEFORE `RA*5*134' Subject: RADIOLOGY INFORMATIONAL UPDATE PATCH FOR NTRT Category: - Informational Description: ============ This is an INFORMATIONAL patch that is a follow on to patch RA*5.0*127. This patch includes instructions to manually change field #9 SEEDING COMPLETE in the Radiology MASTER RADIOLOGY SITE File (71.98) from N to Y. This patch should not be exercised until the content of the MASTER RADIOLOGY PROCEDURE file (#71.99) has been deployed. When the content of the MASTER RADIOLOGY PROCEDURE file (#71.99) has been deployed the NTRT group sends a message to the NTRT_NOTIFICATION-L listserv. The ADPAC for the facility shall subscribe to this list using the following web site: http://vaww.listserv.domain.ext/scripts/wa.exe. The NTRT group does not own the List Serve application. The List Serve is a VA service. The ADPAC will need to create an account using a username and password that does NOT synchronize with the ADPAC's VA network account. ***************** DO NOT CHANGE ANY VALUES EXCEPT FOR field #9 SEEDING COMPLETE. ***************** CHANGE INSTRUCTIONS: ========================== Systems Installer (OI&T): Verify that the MASTER RADIOLOGY PROCEDURE file (#71.99) (MRPF) has been populated with data. The pre-deployment MASTER RADIOLOGY PROCEDURE file (#71.99) will contain nine (9) entries. ADPAC: Do not continue until The system installer has verified that the MASTER RADIOLOGY PROCEDURE file (#71.99) (MRPF) content has been deployed to your facility. Navigate to the Radiology Supervisor menu. Suggested method is: Menu Path: Core Applications -> Rad/Nuc Med Total System Menu -> Press "Enter Key" to select a "Sign on Imaging Location" -> Supervisor menu. Select SEED Master Procedure file seeding Complete. At the prompt SEEDING COMPLETE: NO// enter 'Y' to change the value from NO to YES. This will allow request messages to be sent when a new Radiology Procedure is created and has not been associated to the MASTER RADIOLOGY PROCEDURE file (#71.99). Press to return to the Supervisors menu. You may exit the Supervisors menu at this time. Routine Information: ==================== No routines included. ============================================================================= User Information: Entered By : Date Entered : JAN 25, 2017 Completed By: Date Completed: MAR 03, 2017 Released By : Date Released : MAR 06, 2017 ============================================================================= Packman Mail Message: ===================== No routines included