============================================================================= Run Date: JUN 02, 2023 Designation: YS*5.01*230 Package : YS - MENTAL HEALTH Priority: Mandatory Version : 5.01 SEQ #167 Status: Released Compliance Date: JUL 03, 2023 ============================================================================= Subject: National Clozapine Registry 1.2.22.0 Category: - Informational Description: ============ The purpose of Mental Health patch YS*5.01*230 is to address user stories in sprints 23, 24, and 25 for increment 5 release 1.2.22.1 along with defects found in previous releases. The National Clozapine Registry (NCR) application is used to track the use of Clozapine throughout Department of Veterans Affairs (VA). The NCR v1.2.22.1 Graphical User Interface (GUI) is available only to staff at the National Clozapine Coordinating Center (NCCC). NCR v1.2.22.1 is planned for release into the VA enterprise cloud. Deployment and installation are done by the Configuration Management Team (CMT). The software for this release will be hosted in the VA enterprise cloud servers. No site involvement is needed and there are no components added to Veterans Health Information Systems and Technology Architecture (VistA). This patch provides documentation of the changes made to this cloud-based application. Patch Components: ----------------- Files & Fields Associated: File Name (Number) Field Name (Number) ------------------ ------------------- Not Applicable (N/A) Forms Associated: Form Name File Number --------- ----------- N/A Mail Groups Associated: Mail Group Name New/Modified/Deleted --------------- -------------------- N/A Options Associated: Option Name New/Modified/Deleted Type -------------------- ---- N/A Protocols Associated: Protocol Name New/Modified/Deleted ------------- -------------------- N/A Security Keys Associated: Security Key Name ----------------- N/A Templates Associated: Template Name Type File Name (Number) ------------- ---- ------------------ N/A Remote Procedures Associated: Remote Procedure Name New/Modified/Deleted --------------------- -------------------- N/A Parameter Definitions Associated: Parameter Name New/Modified/Deleted -------------- -------------------- N/A Additional Information: New Service Requests (NSRs): ---------------------------- 201000703 Patient Safety Issues (PSIs): ----------------------------- N/A Defect Tracking System Ticket(s) and Overview: ---------------------------------------------- NCC-12953, NCC-10434, NCC-12940, NCC-12952: SSOi Implementation Initiative: Authentication is handled via Single Sign-On Internal (SSOi) by the Identity and Access Management (IAM) service using the Transport Layer Security (TLS) 2.0 protocol. Users of the system will require a Personal Identity Verification (PIV) card and associated Personal Identification Number (PIN). A user's PIN will be requested when initially logging into a Government Furnished Equipment (GFE). When a user accesses the NCR application their credentials are automatically read and submitted to the IAM SSOi for authentication. The IAM Sign-In Message will display and require the user to click on the Close button. When signing on the first time, an authentication Single Sign-On loading screen will appear if the user is not registered with the IAM SSOi provisioning system. Users are automatically signed out of the application after 10 minutes. Test Sites: ----------- N/A Software and Documentation Retrieval Instructions: -------------------------------------------------- ****** N/A - This is an informational patch ONLY. ****** Documentation Title File Name ------------------- --------- N/A Patch Installation: ------------------- ****** This is an informational patch ONLY. ****** ****** There is NO install to be done by sites. ****** Pre/Post Installation Overview: ------------------------------- N/A Pre-Installation Instructions: ------------------------------ N/A Installation Instructions: -------------------------- ****** This is an informational patch ONLY. ****** ****** There is NO install to be done by sites. ****** Post-Installation Instructions: ------------------------------- N/A Back-Out/Roll Back Plan: ------------------------ N/A Routine Information: ==================== No routines included. ============================================================================= User Information: Entered By : Date Entered : MAY 12, 2023 Completed By: Date Completed: JUN 01, 2023 Released By : Date Released : JUN 02, 2023 ============================================================================= Packman Mail Message: ===================== No routines included